Parking garage repair and restoration

Project Name: Whiting Street Garage
Owner: City of Tampa, FL
Project Location: Tampa, FL
Project Date: 2007

Structural concrete repairs to deck surface, structural columns and beams. Removal of existing 2” asphalt topping on upper level, mechanical abrading of exposed concrete followed by the installation of a Urethane Traffic Topping System. Installation of new guard rail system, steel handrail fabrication and installation and application of new paint.

Parking garage repair and restoration

Project Name: Parking Garage “B”, Orlando International Airport
Owner: Greater Orlando Aviation Authority
Project Location: Orlando, Florida
Project Date: 2003, 2006

Replacement of 21,560 post-tension grout pockets, replacement of 4,500 LF of post-tension barrier cable, cleaning and painting of corroded barrier cable strands. Removal, Modification and reinstallation of metal railing system at the up and down helix ramps, Major spall repair at exterior barrier walls.

New traffic topping system

Project Name: Daytona Regional Service Center
Owner: State of Florida, Department of General Services
Project Location: Daytona Beach, FL
Project Date: 2006, 2007

Removal of existing traffic membrane followed by the installation of a new urethane traffic topping system on parking garage and bridge to main building. Installation of Emseal expansion joints on elevated walkways. Installation of Dow Fast Cure expansion joints on parking garage.

High performance traffic topping system and structural concrete repairs

Project Name: Main Street Parking Garage
Owner: City of Lakeland, FL
Project Location: Lakeland, FL
Project Date: 2000

Installation of high performance traffic topping system to the upper level of the garage. Structural concrete repairs including beams, columns and deck surfaces. Installation of urethane sealants in all precast joints, replacement of existing metal doors with new fiberglass doors and total
exterior repaint.